You are here: Home > Products & Services > Internet Data Centre > Beijing/Shenzhen Data Centre
Beijing,<br>Shenzhen<br>Data Centre

Beijing,
Shenzhen
Data Centre

Beijing Data Centre (BJDS1)

Address:
Electrical City, Building 10, North Rd of Jiuxian Bridge, Chaoyang district Beijing, China

Level of data centre certifications:

  • Design according to Uptime Institute Tier III standards
  • ISO 9001 Quality IT System Management Certied
  • ISO 27001 Information Security Management Certied

Number of IT racks:
Approx. 1,500

product_3

Premises

Seismic grade: Grade 9
Gross floor space: 11,800M2
Raised floor height: 750 mm
Floor to ceiling height: 5,500 mm
Floor loading:15 KN/m2
Fire protection system:
• FM200 suppression system
• Very Early Smoke Detection Apparatus (VESDA)

Cooling

CRAC redundancy: 2N
Water-cooled chiller redundancy: N+1

Other

Network:

  • Dual-routing design
  • Stationed operators are China Telecom, China Unicom and China Mobile

Power Supply

Power distribution to IT racks: 2N
Diesel generator redundancy: N+1
UPS redundancy: N+1
Standard rack power density: 4KVA

Safety

Security system:

  • 24×7 security guard patrols
  • CCTV monitoring
  • Contactless IC card

Shenzhen Data Centre (SZDS2)

Address:
4th Floor, Computer Room Building, National Supercomputing (Shenzhen) Center, No.9, Duxue Road, Nanshan District, Shenzhen

Level of data centre certifications:

  • Design according to Uptime Institute Tier III standards
  • ISO 9001 Quality IT System Management Certifi­ed
  • ISO 27001 Information Security Management Certi­fied

Number of IT racks:
Approx. 500

product_5

Premises

Seismic grade: Grade 7
Raised floor height: 600 mm
Floor to ceiling height: 5,400 mm
Floor loading:12KN/m2
Fire protection system:
• FM200 suppression system
• Very Early Smoke Detection Apparatus (VESDA)

Cooling

CRAC redundancy: N+1
Water-cooled chiller redundancy: 2N

Other

Network:

  • Dual-routing design
  • Stationed operators are China Telecom, China Unicom and China Mobile

Power Supply

Power distribution to IT racks: 2N
Diesel generator redundancy: N+1
UPS redundancy: 2N
Standard rack power density: 3KVA

Safety

Security system:

  • 24×7 security guard patrols
  • CCTV monitoring
  • Contactless IC card

Services and Commitment

Customised Services

  • Basic operation and maintenance service
  • Visualised network admin system
  • Active response

Remotehead Support

  • Power cycling – manual switching on/off or restarting customer’s equipment, inserting and pulling out network peripheral card
  • Cables and connection – physically plugging into and plugging out cables from ports, installation and removal of copper cable/optic fiber patch cord, providing identification of cable plugging in and plugging out
  • Monitoring report – providing monitoring and alarm report for user’s equipment
  • Installation and management of equipment – unpacking, installation; installation of cables; replace or remove of hot plug and modular equipment
  • Treatment of spare parts – receiving and storing new spare parts and replacing faulty spare parts in areas prescribed by customers

Public Facilities

  • Provide sufficient space for equipment installation and debugging
  • Provide Internet access for customer’s working/meeting area
  • Integrated intelligent building management system (BMS) provides 24-hour monitoring of electricity, environment, facility and safety

Services Grade

Network

  • Operator neutral facility which adopts redundant dual Meet-Me-Room
  • Network partitioning with high safety level, meanwhile providing cabinet cross-linking and jumpers
  • Providing various network services to satisfy clients’ various requirements for cost, capacity, routing, protection and service level (SLA)
  • Network services include:
    • Virtual Private Network (IPVPN)
    • Internet access

Data Centre

Measuring standard Target Type
Power availability
Excluding entire power-off time (A&B)
99.99% Promise
Temperature
Average temperature: <br>20-25°C
99.99% Promise
Related humidity
Humidity: 30-70%
99.99% Promise
Maximum response time
• Acknowledgement of receiving client’s request
• Respond to customer’s direct calling
15 minutes Target